External walls : primer coat + ace weather proof paint
Brand : Asian/Berger/Dulux/Equivalent
Electrical
Light & Power points – As per Electrical Design
Geyser points – All bathrooms
AC provision – Any 1 room per floor
Conduits – Good quality, hidden in slabs and walls
Copper wire –Anchor/Equivalent
External electrification is included
Switches & Plates
A main DB & MCB
Plumbing
Internal & External Water Supply System
Connection for water inlet from corporation
External sewage system – Inspection chambers & sewage outlet to site boundary
Class B PVC pipes – Astral/Supreme/Equivalent.
Solar & Geyser Provision.
Rain water harvesting facility – Ground water recharge.
PVC Overhead Tank – Ganga or Equivalent.
Fixtures
Kitchen Sink with accessories
CP & Sanitary fixtures such as Wash Basin, WC, Taps and other accessories like bottle trap, gratings etc. : Hindware/Cera – bathroom attached toilet.
Electrical fixtures – Not Included.
Doors
Doors – Main Door : Teak Wood frame & shutter including hardware.
Internal Doors : Any wood frame & shutter including cost of hardware.
Internal Door frames & shutters – Painted (only)
Main Door – Polished with melamine by hand
Bathroom, Terrace & Utility Door – Frame & shutter including hardware.
Door hardware – Ozone/Europa/Dorma make.
Door hinges – SS hinges
Door & Door Frame cost – Inclusive of planing, rebate, transportation etc.
Windows
Aluminium windows – 5mm clear glass with MS Grills.
Basic price : Alujminium/uPVC window including MS grills.
Fabrication
Main Gate: MS Gate.
External staircase & balcony railing : MS Railing.
Internal staircase railing : SS Railing.
Utility grill is not included in the package.
Compound Wall
Readymade/ Pre-cast Compound wall – Maximum thickness of 3″ (If charged)
The compound wall is painted
Excavation, Foundation, PCC, Size Stone Masonry with DPC course above SSM
Height of compound above – 5 Feet above Plinth level
Elevation
This proposal includes basic elevation design for your home
A 3D elevation is presented for client to choose from & design
Elevation can be designed & more elements may be added at very nominal cost to the design
Exclusions & Incidentals
A design if needed to be modified more than thrice shall be charged for accordingly
Government fees for the liaison bodies to be paid directly by the client
The complete fee payment for plan sanction in Panchayat limits need to be borne by client
Assuming the site & road level to be equal, if the ground level needs to be raised above 18”, it shall be charged for accordingly
Hard rock/soft rock excavation, if it arises shall be charged for accordingly
Buying new earth/sending existing earth for excavation/backfilling purpose shall be charged.
Percentage of opening for door & windows – 12% Maximum
Any work not mentioned within this package or outside the site boundary shall be charged for accordingly
One point of Electricity & water needs to be provided by the client free of cost to facilitate construction
SBC of soil is considered at 180 KN/M2 and depth of the foundation considered at 5 Feet, any increase in depth shall be charged accordingly on actuals upon site conditions
If there is constraints in material delivery or socking place and materials to be order in small quantities, the additional charges for the same shall be charged on actuals
A specific area to construct labour and material shed needs to be provided within 50 feet from the construction place by the client
Any road cutting charges for the connection of Electricity and Sewage lines is not included, such works shall be charged additionally
NOTE: The above mentioned material specifications are generalized, the inclusion or the exclusion of the same shall vary depending on the floor plan.
Payment Structure
A customized payment schedule will be shared based on the project specifications.